Equinix, Inc connects the world’s leading businesses to their customers, employees and partners inside the most interconnected data centers. In 48 markets across five continents, Equinix is where companies come together to realize new opportunities and accelerate their business, IT and cloud strategies. In a digital economy where enterprise business models are increasingly interdependent, interconnection is essential to success. Equinix operates the only global interconnection platform, sparking new opportunities that are only possible when companies come together. Equinix.com

Equinix Logo
Headquarters:
One Lagoon Drive 4th Floor Redwood City, CA 94065
EQIX Stock:
NASDAQ: EQIX
Revenue:
$4.8 Billion
CEO:

Charlie Meyers

Services:
Cloud Connections: AWS, Azure, Oracle, Google, Retail Colocation (Cabinets, Cages, RU), Wholesale Data Center, Internet Exchange
Company Type:
Carrier-Neutral
Cross Connect:
MRC and NRC

Links

Wiki:
Careers:

Equinix News Add Post


Equinix Data Center Map


Equinix Locations


Show Sites
  • 43,356 Gross SqFt
  • 31.2 Megawatts

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Equinix Dallas DA7
6653 Pinecrest Drive
Plano, TX 75024
Located in Dallas
  • 38,000 Gross SqFt
  • 10,000 SqFt Under Construction
Equinix Ashburn DC3
44470 Chilum Place
Ashburn, VA
Located in Northern Virginia
  • 95,444 Gross SqFt
  • 5.5 Megawatts
Equinix Toronto TR1
151 Front Street West
Toronto, Ontario M5J 2N1, Canada
Located in Toronto
  • 36,078 Gross SqFt
  • Does not own Owns the Building
Equinix Toronto TR2
45 Parliament Street Toronto
Ontario M5A 0G7 Canada
Located in Toronto
  • 106,500 Gross SqFt
Equinix Ashburn DC6-DELETE
21721 Filigree Ct.
Ashburn, VA 20147
  • 148,659 Gross SqFt
  • 7.5 Megawatts
Equinix Atlanta AT1
180 Peachtree Street NW
Atlanta, GA 30303
Located in Atlanta
  • 79,201 Gross SqFt
  • 4.0 Megawatts

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna al

Equinix Atlanta AT2
56 Marietta Street NW
Atlanta, GA 30303
Located in Atlanta
  • 26,966 Gross SqFt
  • 0.7 Megawatts
Equinix Atlanta AT3
56 Marietta Street NW
Atlanta, GA 30303
Located in Atlanta
Equinix Boston BO1
74 West Street
Waltham, MA 02451
Located in Boston
  • 22,000 Gross SqFt
  • 0.4 Megawatts

Files


November 2018
November 2018

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Photos


Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ...
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ...
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ...

The project team was able to deliver in just 180 days this two-story, 22.5-MW, 225,000-sq-ft greenfield data center, including the fit-out and commissioning of 160,000 sq ft of data hall space an...
A Building
Source: the company
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ...
lorem
Posted in Equinix New York NY8

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

DC11 Test Photo of Campus Child
Posted in Equinix DC11-test
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ...
Test 8844
Posted in Equinix Chicago CH1, CH2, & CH4

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Source: cyrusone.com
Alt tag testing without description 9924
Posted in Equinix Chicago CH1, CH2, & CH4
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ...
Equinix Test Photo 8843
Posted in Equinix Chicago CH1, CH2, & CH4

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.


The project team was able to deliver in just 180 days this two-story, 22.5-MW, 225,000-sq-ft greenfield data center, including the fit-out and commissioning of 160,000 sq ft of data hall space an...
9923 Test of the tags
Posted in Equinix Chicago CH1, CH2, & CH4

The project team was able to deliver in just 180 days this two-story, 22.5-MW, 225,000-sq-ft greenfield data center, including the fit-out and commissioning of 160,000 sq ft of data hall space and MEP galleries.

Design and construction occurred concurrently, requiring extensive coordination and communication among team members. The aggressive schedule was fast-tracked using double shifts for the shell construction. To accomplish the fit-out schedule, crews worked 24 hours a day, seven days a week.

The building features a precast structural concrete exterior atop concrete foundations, with a slab-on-grade first floor and a second floor consisting of a topping slab above precast double tees.

The team excavated and hauled away 35,000 cu yd of extra fill dirt in the first days on the job. To stay on schedule, trucks operated 16 hours each day. A January 2016 snowstorm dropped about 3 ft of snow on the jobsite. While some of HITT’s other sites were closed for five days following the storm, the data center team had crews back on site in 48 hours.