Site: VAZATA Northern Virginia (NoVa One)

Company: VAZATA
Address:
Usable SqFt: 12,500
Total Power: ??? NN
Interested in this information? Contact us
Megawatts

Building:


  • Data Center construction completed December 2009
  • VAZATA NoVa One data center occupies 12,500 square feet combining data suites 201 & 202 with 2MW of power and an option on 10MW
  • 150’ security surround, designed to Defense Threat Reduction Agency (DRTA) standards
  • Loading docks were designed for vehicles of all sizes, including freight transportation
    • Loading dock is set over 150 feet away from security gate in compliance with DRTA standards
    • Loading dock has the following features:
  • Three 10’ X 11.5’ loading docks with levelers, cowling and task lighting
  • Three 16’ X 11.5’ roll in bays
  • One ground level roll in bay

Map and Nearby Locations:

9651 Hornbaker Road, Manassas, VA (Suites 201 & 202)

SITES within 15 miles of VAZATA Northern Virginia (NoVa One)

Show SqM



Distance Site name SqFt MW
0.00 miles COPT DC-6 100,000
0.00 miles Evoswitch USA WDC 1
3.01 miles Amazon IAD11
4.01 miles Verizon Washington Manassas
11.68 miles DRT 4030 Lafayette Center 73,000 13.30