The Toronto Data Center Map Has 60 Sites

Search Toronto's Data Centers


Toronto Data Center List

151 Front Street
151 Front St W
Toronto, ON M5J 2N1, Canada
  • Owns Owns the Building
  • 275,709 Building SqFt

151 Front Street is Canada's largest carrier hotel, where the telecom, Internet service providers, and content companies colocate to exchange traffic (peer) between their respective networks.

Equinix Toronto TR1
151 Front Street West
Toronto, Ontario M5J 2N1, Canada
  • 36,078 Gross SqFt
  • Does not own Owns the Building

Equinix's facilities in Toronto has a long history that includes several acquisitions. The original suites now operated by Equinix at 151 Front Street began with RACO, a Canadian company that Switch and Data acquired in 2004.

Cologix Toronto TOR2
905 King St W
Toronto, ON M6K 3G9, Canada
  • 20,000 Gross SqFt
  • ??? NN
    Interested in this information? Contact us
    Megawatts

Cologix’s second Toronto data centre site at 905 King Street (TOR 2) was built using standards for concurrent maintainability for space, power, mechanical systems and security. The TOR 2 data centre can be utilized as a stand-alone, diverse bypass facility to Cologix's TOR 1 data centre at 151 Front Street.

Equinix Toronto TR2
45 Parliament Street
Toronto, Ontario M5A 0G7 Canada
  • 106,500 Gross SqFt
  • ??? NN
    Interested in this information? Contact us
    Megawatts
  • TR2 is also known as Parliament Street Data Centre
  • TR2 has metro connections to TR1, which is home to one of Canada's largest financial trading ecosystems.
  • TR2 hosts Internet Exchange, Ethernet Exchange and Equinix Cloud Exchange™ connectivity to TR1.
1547 Ontario TOON1
105 Clegg Rd
Markham, ON L6G 1B9, Canada
  • 42,000 Gross SqFt
  • ??? NN
    Interested in this information? Contact us
    Megawatts

The building was sold to 1547 Critical Systems Realty in 2018. As part of the deal, 1547 will handle wholesale deals in the building. While I.C.E will manage all the retail colocation deployments.


As Canada’s economic hub, Toronto is also home to a growing amount of data centres. The nexus of network interconnection is at the 151 Front Street carrier hotel which is owned by Allied REIT.





Largest Data Centers in Toronto

Gross SqFt Gross SqFt Power (MW) Power (MW)
1 Century Place (TOR1) Digital Realty 226,000 46.00
Compass Toronto Etobicoke 30.00
ServerFarm Toronto TOR1 30,000 21.00
Equinix Brampton TR7 185,000 13.28
Equinix Toronto TR2 106,500 10.00
{{ datacenter.site_name }} {{ datacenter.total_gross_sqft }} {{ datacenter.total_power_mw }}

Data Center Construction in Toronto

Company Region Name Site Name Building SqFt Gross SqFt Power (MWs) Estimated Launch
STACK Toronto STACK Toronto 8.0 Jul 01 2022
Urbacon Data Centre Solutions Toronto Urbacon - Richmond Hill, ON 94691 8.0
Total 94691 0 16.0

Large fiber trays are needed to support all the interconnection at Toronto's carrier hotel.
The site was built next to Equinix's TR2 site in downtown Toronto
The building is owned by Allied REIT

BMO backup facility in Barrie
Posted in BMO Barrie
Meeting Space Inside Digital's TOR1 Toronto site
Posted in 1 Century Place (TOR1) Digital Realty
Digital's new Toronto Site was Formerly the Toronto Star Printing Facility
Posted in 1 Century Place (TOR1) Digital Realty
Equinix TR2
Posted in Equinix Toronto TR2
Source: Equinix
Hallway in TR2
Posted in Equinix Toronto TR2
Source: Equinix
Parliament Street Data Centre
Posted in Equinix Toronto TR2
Source: Marcanadian, on Flickr
Exterior Skin Provides a Good Visual
Posted in Equinix Toronto TR2
Close Up of the Wall
Posted in Equinix Toronto TR2
Street View
Posted in 151 Front Street
Source: Allied
Large fiber trays are needed to support all the interconnection at Toronto's carrier hotel.
Large Fiber Tray at 151
Posted in 151 Front Street

Large fiber trays are needed to support all the interconnection at Toronto's carrier hotel.

Source: Allied
Roof of 151 Front Street is Crowded with Gens and Cooling Equipment
Posted in 151 Front Street
Source: Google Maps
Looking southeast across Front and Parliament streets to the new Downtown Data Centre
Posted in Urbacon Toronto - 281 Front Street
Source: Urbacon
Ground Floor Layout
Posted in Urbacon Toronto - 281 Front Street
Source: Urbacon
Typical Data Floor
Posted in Urbacon Toronto - 281 Front Street
Source: Urbacon
The site was built next to Equinix's TR2 site in downtown Toronto
The Site is Adjacent to Equinix TR2
Posted in Urbacon Toronto - 281 Front Street

The site was built next to Equinix's TR2 site in downtown Toronto

Source: Urbacon
Chillers on the Roof
Posted in Cologix Toronto TOR2
The building is owned by Allied REIT
Exterior of 905 King Street
Posted in Cologix Toronto TOR2

The building is owned by Allied REIT

Lobby of 905 King Street
Posted in Cologix Toronto TOR2
Source: Allied Properties REIT
Rendering of the MGS Guelph Data Centre
Posted in MGS Guelph
105 Clegg Exterior
Posted in 1547 Ontario TOON1
Source: 1547
Cold Aisle Containment
Posted in Priority Colo TOR2
Source: Priority Colo
Row of lockable cabinets
Posted in Priority Colo TOR2
Source: Priority Colo
TOR4 at 105 Clegg Rd
Posted in Cologix TOR4
McQuay Cooling System
Posted in 905 King Street W
Source: Beanfield
Generators on the Roof
Posted in 905 King Street W
Source: Beanfield