Site: OneNeck Denver

Company: OneNeck
Region: Denver
State: Colorado
Region: United States
Region: North America
Address:
Gross SqFt: 35,000
Total Power: ??? NN
Interested in this information? Contact us
Megawatts

The datacenter was built in 2015 at a cost of $20 million.

Phase I provides 35,000 Square Feet, but facility can be built out to 160,000 Square Feet over 5 phases.

Building:


  • Utility Provider: Xcel Energy
  • Utility Feeds:Two 2500 kVA utility transformers
  • Critical Load:1600 kW
  • Generators: Four 1.5 mW
  • UPS: 2N
  • Entrance Facilities: Quadruple entrances to two telecommunications rooms

Carriers: TDS, Comcast, CenturyLink, Level3/TW Telecom, Zayo

Map and Nearby Locations:

8675 Concord Center Drive, Englewood, Colorado

SITES within 15 miles of OneNeck Denver

Show SqM



Distance Site name SqFt MW
0.15 miles CenturyLink DN3
0.15 miles DRT 8534 Concord
0.34 miles EdgeConneX Denver-changed
1.33 miles Verizon Denver 107,000
1.61 miles XO Denver 0.69
1.84 miles zColo 393 Inverness 53,289 5.20
2.33 miles zColo Denver Centennial
2.47 miles ViaWest Denver (Englewood) 21,480
2.47 miles ViaWest Denver Arapahoe 21,374
3.03 miles Equinix Denver DE1 18,900 0.50
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ...
Photo 9944
Posted in Denver

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Source: https://www.datacenterdynamics.com/opinions/new-marseille-peering-point-international-content-hub/