Breakdown of Data Centers on the Interxion Frankfurt Campus
Interxion's Frankfurt campus has the densest concentration networks in Frankfurt. The campus consists of 15 buildings that are all within a few block radius.
Site |
Address |
Power (MW) |
SqM |
CapEx |
Launched |
FRA1 |
Hanauer Landstr. 302, 60314 Frankfurt |
|
|
|
|
FRA2 |
Hanauer Landstr. 304, 60314 Frankfurt |
|
|
|
|
FRA3 |
Weissmuellerstr. 21-23, 60314 Frankfurt |
|
|
|
|
FRA4 |
Weissmuellerstr. 19, 60314 Frankfurt |
|
1,400 |
|
|
FRA5 |
Hanauer Landstr. 308a, 60314 Frankfurt |
|
|
|
|
FRA6 |
Hanauer Landstr. 300a, 60314 Frankfurt |
|
600 |
€5 million |
2010 |
FRA7 |
Hanauer Landstr. 296a, 60314 Frankfurt |
2 |
1,900 |
|
2012 |
FRA8 |
Weissmuellerstr. 36, 60314 Frankfurt |
6 |
800 |
|
2014 |
FRA9 |
Weissmuellerstrasse 25-27, 60314 Frankfurt |
1 |
800 |
€13 million |
2014 |
FRA10 |
Weissmuellerstr. 38, 60314 Frankfurt |
|
4,800 |
|
Opened 2016 |
FRA11 |
Weissmuellerstr. 40, 60314 Frankfurt |
10 |
4,800 |
|
|
FRA12 |
Weissmuellerstr. 29-31, 60314 Frankfurt |
2 |
1,100 |
€19 million |
Opened Q4 2017 |
FRA13 |
Weissmuellerstr. 13, 60314 Frankfurt |
10 |
4,800 |
€90 million |
To open in Q1 2019 |
FRA14 |
Weissmuellerstr. 34, 60314 Frankfurt |
10 |
4,600 |
€76 million |
To open in Q3 2019 |
FRA15 |
|
19 |
9,600 |
€175 million |
To open Q1 2020 |
FRA16 |
Weissmuellerstr 37-39 |
16.5 |
4,800 |
|
Opened Q1 2022 |
Total |
|
60 MWs |
35,200 SqM |
€378 million |
|
Interxion FRA 6
In 2018, Interxion added an additional 400 sqm to the FRA6 data center for €5 million.
Interxion FRA 8
FRA 8 was built in four phases, with each phase providing approximately 900 square meters of equipped space. The building has 6 MW of customer available power. The facility was commissioned in 2014.
Interxion FRA 12
FRA12 is expected to provide approximately 1,100 square metres (“sqm”) of equipped space and a total of approximately 2 MW of customer available power. The capital expenditure associated with FRA12 is expected to be approximately €19 million. FRA12 will be constructed in a single phase that is scheduled to become available in 4Q 2017
Interxion FRA 13
FRA13 will be constructed in two phases, providing 4,800 sqm of equipped space and 10 megawatts ("MW") of customer-available power when fully built out. The first phase of FRA13, which will 2,300 sqm, is planned to open in 4Q 2018; the second phase, which is expected to provide approximately 2,500 sqm, is scheduled to open in 1Q 2019. The capital expenditure associated with FRA13 is expected to be approximately €90 million.
Interxion FRA 14
FRA14 is expected to provide 4,600 sqm of equipped space and will have approximately 10 MW of customer available power when fully built out. FRA14 will be constructed in two phases – the first phase will provide approximately 2,400 sqm of equipped space and is scheduled to open in 3Q 2019, while the second phase will provide 2,200 sqm and is scheduled to open in 4Q 2019. The total capital expenditure associated with FRA14 is expected to be €76 million.
Interxion FRA 15
FRA15 will be built in four phases, providing in total 9,600 square meters of equipped space and 19 megawatts of customer available power when fully constructed. The first phase of FRA15, will have approximately 2,300 sqm, is expected to open for business in early 2020. The capital expenditure connected with FRA15 is expected to be €175 million.