The Chicago Data Center Map Has 67 Sites

List of Chicago Data Centers:


Site name Gross SqFt Usable SqFt Power (MW)
350 E Cermak Carrier Hotel - Digital Realty 1,133,391 100.00
360TCS-Lombard 16,000 10,000 3.00
365 Chicago 21,748 13,767 0.40
Assent CH2 251,141 54.00
Assent CH3 212,000
Atlantic Metro ORD0 20,000 4.20
Atlantic Metro ORD3 10,000 0.75
AT&T Chicago 130,000 77,916
BT Chicago
ByteGrid Chicago CH1 70,000 34,000 2.40
Carter Validus 505 N Railroad Ave
CenturyLink CH2 142,346 8.50
CenturyLink CH3 163,747 65,000 17.60
CenturyLink CH4 41,073 15,000 3.40
CenturyLink IL1
Cogent Chicago (427 S LaSalle) 2,711
Cogent Chicago (600 South Federal) 2,400 0
Cogent Chicago (Jackson)
Cogent Naperville 1,000
Colocation America CH1
Colocation America CH2
Colocation America CH3
Colo@ Chicago 1.50
ColoCrossing CH1 10,000 6,200
Continuum NCDC 603
CoreSite CH1 180,032 129,790
CyrusOne Chicago 30,000 14,000 9.00
Digital Capital Chicago 6,800 0.60
DRT 600 S Federal 161,000 54,000 9.00
DRT Franklin Park Campus 60,000 31.90
DRT MMR 350 East Cermak 59,000 59,000 2.50
DuPont CH2 7.10
DuPont Fabros CH1 485,000 231,000 36.40
Equinix Chicago CH1, CH2, & CH4 0 0 0.00
Equinix Chicago CH3 228,000 77,656 10.80
GTT - 111 North Canal 5,000 2,700
GTT - 717 South Wells 20,000 15,000
InfoRelay Chicago
Level3 Chicago (111 North Canal) 57,847 22,750
Level3 Chicago (200 North LaSalle)
Level3 Chicago (600 South Federal)
Level3 Chicago (600 West Chicago)
Level3 Chicago (Arlington Heights)
Level3 Chicago (Broadview)
Level3 (was GX) Chicago 1,572
NaviSite Chicago (Oak Brook) 16,750
Netrality Chicago 100,000
NetSource Chicago
QTS Chicago 134,000 48,000 24.00
ServerCentral CH1 18,000 11,500 2.60
Server Farm Realty 840 South Canal
Steadfast Chicago 350 E Cermak 16,000 2.00
Steadfast Chicago 725 Wells 30,000 5.00
SunGard CHI-3100 25,000 900
SunGard Wood Dale (341) 44,520 26,000
SunGard Wood Dale (711) 150,000 85,000
SupraNet Chicago
T5 Chicago
telx CHI2 Chicago (600 South Federal) 10,143 10,143 0.35
TierPoint Chicago 25,000 2.00
US Signal Oakbrook
Verizon Chicago 45,000 12.00
Verizon Chicago (Downers Grove) 45,000 15,000
XO Chicago (Oak Brook) 2,700 0.99
XO Chicago (Swift Dr) 1,000 0.22
zColo Chicago 800 E. Business Center 65,000 16.00
zColo Chicago (Swift) 147,000 51,000 17.00

Chicago is a popular location to build colocation and wholesale data centers. Five quick reasons to colocate a data center in Chicago:

  • Chicago is the 3rd largest metro in the United States
  • Nexus of connectivity options
  • Low risk of natural disasters
  • Low to moderate electric utility costs
  • Cooler climate

Chicago Data Center Market


The Chicago Data Center Market is one of the largest data center markets in the US. It is primarily split into 2 distinct markets: Downtown Chicago and Suburban Chicago.

Downtown Chicago Market

Downtown (also known as the Loop) consists of network dense facilities and financial trading deployments. Because of the urban environment, the data centers are tall multistory buildings usually retrofitted from an office tower or a warehouse. That's ok, warehouses have "good bones" because of the ability to support high floor weights and have taller ceilings than office towers.

Downtown Chicago also has higher network density as it is a nexus of networks for the Midwest region. Digital Reality maintains the Meet-Me-Room (MMR) at 350 E Cermak (Lakeside Technology Center) and Equinix's CH1, CH2, & CH4 sites are also in the building. CoreSite's CH1 site at 427 S LaSalle offers modest network density.

Suburban Chicago

The suburbs consist of data centers that are built in a campus environment where the buildings generally are 1 or 2 stories. The suburban data centers have higher power densities and offer more wholesale options. However, there are less Interconnection (Network) options and higher latencies to most destinations. (Most IP traffic needs to be hauled downtown before reaching the broader Internet.)

Wholesale Providers:

  • QTS's Chicago site offers a mix of wholesale and retail floor space. Located in the former Sun Times Press Facility it offers a location just outside of the loop.
  • Digital Realty offers 6 locations in Chicago. 350 E Cermak and 600 S Federal are downtown and network rich retail options. Digital's Franklin Park Campus and the former Dupont Fabros's campus in Elk Grove.
  • RagingWire is in Itasca near Elk Grove

Retail Colocation Chicago Providers:

  • Equinix has 3 locations
  • Zayo has 3 sites
  • Sungard has 3 sites in the Northwest
  • Cyxtera offers 2 locations
  • Steadfast has 2 retail locations downtown.
  • CyrusOne focuses on the Fintech colo after they acquired the CME data center in Aurora.

Electrical Utility:


Illinois's electricity market is deregulated that separates power generation and transport. Commonwealth Edison, aka ComEd, is the primary electric provider that generates its power from Coal (31%), Nuclear (26%, Wind (15%), Natural Gas (14%) and Hydro (7%). Pricing fluctuates, but the average cost in the $.08/kwh range.

Chicago Demographics:

Located at the southern end of Lake Michigan, Chicago is the 3rd largest city in the United States with a MSA population of 9.5 million people. Chicago's economy is one of the world most diverse. There are more than 400 major corporate headquarters, including 31 in the Fortune 500. Source: Wikipedia

Chicago Skyline





Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ...
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ...

The project team was able to deliver in just 180 days this two-story, 22.5-MW, 225,000-sq-ft greenfield data center, including the fit-out and commissioning of 160,000 sq ft of data hall space an...
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ...
Test 8844
Posted in Equinix Chicago CH1, CH2, & CH4

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Source: cyrusone.com
Alt tag testing without description 9924
Posted in Equinix Chicago CH1, CH2, & CH4
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ...
Equinix Test Photo 8843
Posted in Equinix Chicago CH1, CH2, & CH4

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.


The project team was able to deliver in just 180 days this two-story, 22.5-MW, 225,000-sq-ft greenfield data center, including the fit-out and commissioning of 160,000 sq ft of data hall space an...
9923 Test of the tags
Posted in Equinix Chicago CH1, CH2, & CH4

The project team was able to deliver in just 180 days this two-story, 22.5-MW, 225,000-sq-ft greenfield data center, including the fit-out and commissioning of 160,000 sq ft of data hall space and MEP galleries.

Design and construction occurred concurrently, requiring extensive coordination and communication among team members. The aggressive schedule was fast-tracked using double shifts for the shell construction. To accomplish the fit-out schedule, crews worked 24 hours a day, seven days a week.

The building features a precast structural concrete exterior atop concrete foundations, with a slab-on-grade first floor and a second floor consisting of a topping slab above precast double tees.

The team excavated and hauled away 35,000 cu yd of extra fill dirt in the first days on the job. To stay on schedule, trucks operated 16 hours each day. A January 2016 snowstorm dropped about 3 ft of snow on the jobsite. While some of HITT’s other sites were closed for five days following the storm, the data center team had crews back on site in 48 hours.

Top Datacenter Providers in Chicago

Sites Sites Gross SqFt Gross SqFt Power (MW) Power (MW)
Digital Realty Trust 3 1,354,391 140.90
DuPont Fabros Technology 2 485,000 43.50
Assent 2 463,141 54.00
CenturyLink 4 347,166 29.50
Equinix 2 228,000 10.80
{{ provider.company_name }} {{ provider.sites_count_for_region }} {{ provider.sqft_for_region }} {{ provider.power_mw_for_region }}

Largest Datacenters in Chicago

Gross SqFt Gross SqFt Power (MW) Power (MW)
350 E Cermak Carrier Hotel - Digital Realty 1,133,391 100.00
DuPont Fabros CH1 485,000 36.40
Assent CH2 251,141 54.00
Equinix Chicago CH3 228,000 10.80
Assent CH3 212,000